Contractors in Chandler, Arizona
Maricopa County • Population: 278,748
Showing 78 verified contractors
π¦Gutter Cleaning in Chandler
Quick answer
The City of Chandler Development Services Department (480-782-3000) issues building permits and publishes a Homeowner Building Permit Manual. It exempts sheds up to 120 square feet and 7 feet tall and like-for-like water heater, furnace and roof covering swaps, but switching to concrete tile needs a permit and engineering analysis, and permit fees double for work started without one.
Chandler is one of the few Arizona cities that hands homeowners a full permit manual, revised April 2026. It answers most "do I need a permit" questions in one place and is blunt about the cost of skipping one.
Who issues building permits
The City of Chandler Development Services Department issues building permits; the construction permit counter is at 215 E. Buffalo St. and the main line is (480) 782-3000. The Homeowner Building Permit Manual points applicants to the city's Building Safety, Plan Review, Permits and Inspections page to apply and submit plans. Plans can be submitted electronically, and a walk-in plan review service runs Monday through Friday, 8 a.m. to 4:30 p.m., for most residential additions and renovations. Plans submitted on or after July 1, 2025 must meet Chandler's amended 2024 International Codes. For "do I need a permit" questions, call the Plan Reviewer of the Day at 480-782-3078; for setbacks, the Planner of the Day at 480-782-3050.
The manual says any construction that requires a permit must be done by a licensed contractor unless the owner-applicant does the work, and a home you rent to others needs a licensed contractor to obtain the permit. If you're in an HOA, the city wants the association's approval before you apply, and it does not enforce HOA rules itself.
What Chandler exempts
The manual's "Work Exempt from Permit" list includes:
- One-story detached accessory structures up to 120 square feet and 7 feet tall
- Fences up to 7 feet high
- Retaining walls up to 4 feet, measured from the bottom of the footing, unless supporting a surcharge
- Sidewalks and driveways
- Painting, tile, carpet, cabinets, countertops and similar finish work
- Prefabricated pools under 18 inches deep
- Like-for-like replacement of water heaters, water softeners, furnaces, pool or spa heaters, evaporative coolers, water treatment systems, circuit breakers, and roof coverings that don't add load to the structural frame
Ordinary repairs are exempt too, but not if they cut into walls, remove structural members, change egress, or alter piping, wiring or mechanical systems.
Where homeowners get caught
- Re-roofing: you need a permit when replacing old roofing with a different material such as concrete tile, which also requires an engineering analysis of the existing roof, or when the existing roof already exceeds two layers.
- Stucco: one-coat stucco always needs a permit, and the inspector will check that the installer is a licensed applicator. Three-coat systems also need a permit. The only exemption is stucco applied directly to block walls with no lath.
- Arizona rooms: Chandler doesn't allow a patio enclosed with windows to count as non-habitable space. An enclosed patio has to meet the rules for a room addition.
- Working without a permit: the city can issue a legal notice or order to comply, can order non-compliant work removed, and doubles permit fees.
The manual also includes pool barrier guidelines; Arizona's statewide pool enclosure rule, A.R.S. 36-1681, calls for a 5-foot barrier with self-closing, self-latching gates that open outward, unless every resident of the home is at least six years old.
Grass removal rebate
Chandler's residential water conservation rebates pay $1.50 per square foot of grass converted to xeriscape, up to $2,000. City Council cut the rate from $2.00 and the cap from $3,000 effective January 1, 2026. The rules:
- Get a pre-inspection and Notice to Proceed before any grass is removed; finished projects don't qualify.
- Finish within 90 days and cover at least 50% of the area with low-water-use plants at maturity.
- Artificial turf, pavers and other hardscape aren't rebated, and pools or fountains can't go in the conversion area.
Smart irrigation controllers get 50% of the price back, up to $250.
Contractor licenses
Look up every bidder on the Registrar of Contractors Contractor Search. See our permit requirements page and Arizona licensing guide.
Weather
The nearest NOAA station with heat normals is Chandler Heights, southeast of the city. Its 1991-2020 normals show about 165 days a year at 90Β°F or hotter and about 95 days at 100Β°F or hotter, with an average July high of 104.2Β°F in the monthly normals. That station doesn't publish a precipitation normal. Monsoon storms hit from July through September, so schedule tile roof work and AC replacement for spring or fall.
Find contractors in Chandler
The directory lists Chandler plumbers, electricians, HVAC companies, roofers, remodelers, landscapers, painters, fence companies, concrete contractors and window and door companies.
Compare quotes with our Arizona roofing costs and landscaping costs, use the hiring checklist, and get quotes.
Sources
- City of Chandler: Homeowner Building Permit Manual (PDF, rev. 4/09/26)
- City of Chandler: Building Safety, Plan Review, Permits and Inspections
- City of Chandler: Residential Water Conservation Rebates
- City of Chandler: City revises water conservation rebates
- A.R.S. 36-1681: Pool enclosures
- Arizona ROC Contractor Search
- NOAA 1991-2020 annual/seasonal normals: Chandler Heights (USC00021514)
- NOAA 1991-2020 monthly normals: Chandler Heights (USC00021514)
Frequently asked questions
Do I need a permit to re-roof in Chandler?
Like-for-like roof covering replacement that doesn't add load to the frame is exempt. You need a permit when you switch to a different material such as concrete tile, which also requires an engineering analysis, or when the old roof already has more than two layers.
How big can a shed be without a permit in Chandler?
Chandler's manual exempts one-story detached accessory structures up to 120 square feet of floor area and 7 feet tall. Zoning setbacks still apply, so check with the Planner of the Day before placing it.
What is Chandler's grass removal rebate in 2026?
Effective January 1, 2026, Chandler pays $1.50 per square foot of grass converted to xeriscape, up to $2,000. You need a Notice to Proceed before removing grass, the project must be finished within 90 days, and artificial turf doesn't qualify.
Can a landlord pull an owner-builder permit in Chandler?
No. Chandler's manual says that if you own a home you lease or rent to others, a licensed contractor is required to obtain the permit.