Contractors in Gilbert, Arizona
Maricopa County • Population: 287,285
Showing 73 verified contractors
π¦Gutter Cleaning in Gilbert
Quick answer
The Town of Gilbert's Development Services department issues permits through its OneStopShop portal (480-503-6700). Town code lets construction run 5 a.m. to 10 p.m. on weekdays but only 7 a.m. to 7 p.m. on weekends and holidays, and the Land Development Code requires a 5- to 6-foot pool enclosure with self-closing, self-latching gates.
Gilbert is a town, not a city, and its rules live in the Town Code and the Land Development Code. Two of them shape most backyard projects: construction hours that differ on weekends, and a pool enclosure rule that reaches into your neighbor's yard.
Who issues permits
Gilbert's Development Services department handles plan review, permits and inspections. Applications, permit lookups and inspection scheduling run through the OneStopShop portal, and Development Services representatives answer at (480) 503-6700 or onestopshop@gilbertaz.gov (Permits, Applications & Checklists). Most Town services keep extended hours of 7 a.m. to 6 p.m., Monday through Thursday. Gilbert also offers virtual building inspections.
The Plan Review page says the Town now collects an estimated plan review fee at the time of application, based on the valuation you state. Miscellaneous electrical, plumbing and mechanical work is one of the review categories. The Town's Miscellaneous Residential Checklist lists what to submit for fences and retaining walls (site plan, elevations, structural details or Town standard details), for gas lines and other trade work (site plan with utility routing and diagrams), and for pools and spas (site plan, equipment location, structural plans or an approved standard plan, and a grading and drainage plan on larger lots zoned SF-15, SF-35 or SF-43).
Construction hours
Gilbert's noise ordinance, Town Code Sec. 42-63, sets these windows:
- Concrete: 5 a.m. to 10 p.m. each day.
- Other construction in or within 500 feet of a residential zone: no earlier than 5 a.m., done by 10 p.m.
- Saturdays, Sundays and holidays: construction 7 a.m. to 7 p.m., concrete pours 6 a.m. to 7 p.m.
Work outside these hours needs a permit from the Town; apply under "Deviation from Authorized Construction Times" in OneStopShop. The director can issue a stop order on a project that violates the section. Statewide, A.R.S. 9-500.52 bars any Arizona city or town from enforcing a noise rule that stops permitted construction from 5 a.m. to 7 p.m. on business days between May 1 and October 15.
Pool enclosures and location
Gilbert's pool barrier policy quotes Land Development Code Section 5.2.7:
- In residential districts, private pools go in side or rear yards, at least 3 feet from any property line, and not inside a recorded easement without the easement holder's written approval. On a corner lot, a pool must be at least 5 feet from the street-side line.
- Pools must be enclosed by the walls of the house or by a solid wall, chain link or wrought iron fence 5 to 6 feet tall. No opening may let a 4-inch ball through, and gates must match the fence height and be self-closing and self-latching.
- Pool fences are measured on the side away from the pool. Raised planters, decks and water features that are easy to climb must sit at least 3 feet from a pool fence.
- Internal fences over 3 feet tall need building permits and inspections.
- If a new pool puts a neighbor's pool out of compliance, the new pool won't pass inspection until both comply.
Ask your pool builder to show the barrier plan, including the shared property fence, before you sign. Arizona's pool contract statute is covered in our residential contract requirements page.
HOAs
If your home is in an HOA, Town approval and HOA approval are separate steps. Get the association's written sign-off before your contractor orders materials.
Contractor licenses
Gilbert's permit page notes that work in a commercial building must be done by an Arizona licensed contractor. For your home, check any contractor on the Registrar of Contractors Contractor Search, and read our Arizona licensing guide and permit requirements overview.
Weather
The closest NOAA stations split the data. The Mesa station, just north of Gilbert, averages 8.66 inches of precipitation a year in the 1991-2020 normals, with 2.68 inches from July through September in the monthly normals. The Chandler Heights station to the southeast averages about 165 days at 90Β°F or hotter and about 95 days at 100Β°F or hotter. Plan AC replacement before the 100-degree stretch, and if you're adding a pool, start early enough that excavation isn't stopped by July and August storms.
Find contractors in Gilbert
The directory lists Gilbert plumbers, electricians, HVAC companies, roofers, remodelers, landscapers, painters, concrete contractors and window and door companies.
Compare bids with our Arizona concrete costs and fencing costs, use the hiring checklist, and get quotes.
Sources
- Town of Gilbert: Permits, Applications & Checklists
- Town of Gilbert: Plan Review
- Town of Gilbert: Miscellaneous Residential Checklist (PDF)
- Town of Gilbert: Noise Ordinance, Sec. 42-61 to 42-64
- Town of Gilbert: Swimming Pool / Spa Barrier Policy and LDC 5.2.7 (PDF)
- A.R.S. 9-500.52: Construction; summertime hours
- Arizona ROC Contractor Search
- NOAA 1991-2020 annual/seasonal normals: Mesa (USC00025467)
- NOAA 1991-2020 monthly normals: Mesa (USC00025467)
- NOAA 1991-2020 annual/seasonal normals: Chandler Heights (USC00021514)
Frequently asked questions
What hours can contractors work in Gilbert?
Town Code Sec. 42-63 allows construction from 5 a.m. to 10 p.m. each day in or within 500 feet of a residential zone, with concrete pours also allowed from 5 a.m. On Saturdays, Sundays and holidays, construction runs 7 a.m. to 7 p.m. and concrete can start at 6 a.m. Other hours require a permit from the Town.
How tall does a pool fence have to be in Gilbert?
Section 5.2.7 of Gilbert's Land Development Code requires pools to be enclosed by the house walls or by a solid wall, chain link or wrought iron fence at least 5 feet and no more than 6 feet tall, with no opening a 4-inch ball can pass through, and gates that self-close and self-latch.
Can a new pool fail inspection because of my neighbor's fence?
Yes. Gilbert's pool barrier policy says that if a new pool puts an adjoining neighbor's pool out of compliance, the new pool should not pass inspection until both pools meet the Land Development Code.
Do interior yard fences need a permit in Gilbert?
Gilbert's pool barrier policy says internal fences over 3 feet tall, meaning fences inside the property-line fence, require building permits and inspections.