Arizona sets a minimum list of terms for home improvement contracts. The general rule is A.R.S. 32-1158. Pools and spas add the payment schedule in 32-1158.01, and storm-damage repairs add cancellation rights in 32-1158.02. The Registrar of Contractors (ROC) publishes a sample contract for each on its Contract Requirements page. Use this page as a checklist before you sign.
Contracts over $1,000: the required terms
Any contract over $1,000 between a contractor and the owner of the property to be improved must contain, in writing, at least (32-1158(A)):
- The contractor's name, business address and license number.
- The owner's name and mailing address, and the jobsite address or legal description.
- The date the contract was signed.
- The estimated completion date for all the work.
- A description of the work.
- The total dollar amount you will pay for all the work, including applicable taxes.
- The dollar amount of any advance deposit paid or scheduled.
- The dollar amount of each progress payment and the stage of construction at which the contractor may collect it.
- A statement that you have the right to file a written complaint with the ROC for an alleged violation of 32-1154(A), with the ROC's phone number and website, and that complaints must be made within the time set in 32-1162(A). This item must be prominently displayed in at least 10-point bold type, and the contract must be signed by you and the contractor or its representative.
At signing
The contractor must give you a legible copy of every document you signed and a signed receipt for any cash in the true amount (32-1158(B)). The ROC's advice is to never pay in cash, to make checks payable to the company named in the contract, and to keep payments from getting ahead of the work (ROC: Before You Hire).
What happens if a term is missing
The requirements "are not prerequisites to the formation or enforcement of a contract," and a missing term isn't a defense for either side in a lawsuit (32-1158(C)). A contractor who leaves terms out can still face ROC discipline for failing to comply with the chapter (32-1154(A)(12)).
What else to put in writing
The statute is a floor. The ROC recommends the contract also spell out (ROC: Before You Hire):
- Who pulls and pays for permits. The ROC says permits are the property owner's responsibility, though many contractors include them in the price.
- HOA approvals. You must tell the contractor about CC&R restrictions before signing.
- Temporary power and water, trash removal and sanitary facilities.
- A payment or draw schedule tied to finished work.
- Change orders: how each one changes price and schedule, and that both parties must sign. The ROC's sample contract says no change in scope is binding unless set out in a signed change order (ROC sample general construction contract).
The license number shows up elsewhere too
The contractor's license number, preceded by "ROC," must appear on all written bids and estimates, advertising and letterhead, and be posted at the jobsite (A.R.S. 32-1124(B)). If the number on the contract doesn't match the ROC Contractor Search, stop.
Pools and spas: A.R.S. 32-1158.01
For a residential in-ground pool or spa sold to a buyer who lives in, or plans to live in, the home, the contract must include everything in 32-1158 plus (32-1158.01(A)):
The right to request payment and performance bonds. You pay the bond's cost, and the contractor may not add a surcharge or service charge.
A payment schedule with these caps:
| Stage | Maximum payment |
|---|---|
| At signing (down payment) | 15% of the original contract price |
| After excavation | 25% of the original price plus approved change orders |
| After steel, plumbing and shotcrete (or a prefab pool installed) | 25% |
| After decking | 25% |
| Before interior finish (or completion of a prefab pool) | All remaining sums |
Notices in at least 10-point type, in a form the ROC approves, of your right to written material about the statute and the ROC's dispute procedures, and of your rights under Title 44, Chapter 15 (the home solicitation sales law).
If you require a payment and performance bond, you and the contractor can change the payment schedule by agreement (32-1158.01(B)). Every change to the work must be in a written change order, and a contractor who ignores these rules violates 32-1154(A) (32-1158.01(C)-(D)).
Caliche is a real issue on Arizona pool digs. If the bid includes allowances for hard digging or rock, get the rate and how it will be measured in writing, because the excavation draw comes due when digging is done.
Storm-damage repairs: A.R.S. 32-1158.02
Monsoon storms from July through September damage roofs, and door-to-door roofers follow them. For residential repair or replacement of damage "resulting directly from a catastrophic storm in a specific area that is designated by an insurer," the contract must add these terms for a buyer who lives in the home (32-1158.02(A)):
- In at least 10-point bold type: "You may cancel this contract at any time within seventy-two hours after you have been notified that your insurer has denied your claim to pay for the goods and services to be provided under this contract."
- In at least 10-point bold type: "You may cancel this contract at any time, for any reason, within four business days after signing this contract."
- A repair estimate that describes and locates all claimed damage, gives the square footage for roof work, explains any excluded areas, states whether the property was inspected and whether the roof was physically accessed, says the contractor made no promise the loss is covered, and says you pay if the insurer denies coverage.
Other protections in the same section:
- Cancel in writing to the contractor's address in the contract. No special form is needed; the notice just has to say you don't intend to be bound (32-1158.02(C)).
- Refund within 10 days of cancellation, minus reasonable charges for itemized emergency services (32-1158.02(D)).
- Down payment no more than 50% of the total (32-1158.02(E)).
- No deductible games. The contractor may not pay, promise or advertise to pay your deductible or rebate it, and may not start work until the insurer approves or denies the claim, except to prevent further loss (32-1158.02(J)).
- No acting as your adjuster or negotiating your claim for you. With your permission and without pay, the contractor may talk with your insurer about the claim (32-1158.02(L)).
- No signing during the event. A contractor may not propose a contract while the loss is still occurring or while fire or other public safety crews are responding at the property (32-1158.02(O)).
- An unlicensed person can't sue you to collect for post-storm repair work (32-1158.02(K)).
Door-to-door sales
If a salesperson came to your home uninvited and you signed there, the home solicitation law applies on top of these rules. You have until midnight of the third business day to cancel, and the contract must include a Notice to Buyer and a Notice of Cancellation form (A.R.S. 44-5002, 44-5004). See right to cancel.
Solar contracts
Contracts to buy, finance or lease a solar system have their own disclosure list in A.R.S. 44-1763, including a right to rescind for at least three business days before installation, and they must also comply with 32-1158. The rules changed in 2026; see recent law changes.
Liens
Ask for lien waivers with each payment if subcontractors or suppliers are involved. If you live in the home, only those with a written contract directly with you can lien it (A.R.S. 33-1002). See owner-occupant lien protection.
Related pages
- ROC complaint process
- Mechanics' lien law
- Hiring checklist
- Contracts and payments topics
- Roofers and roofing costs in Arizona
Sources
- A.R.S. 32-1158, Contract requirements
- A.R.S. 32-1158.01, Swimming pool and spa contracts
- A.R.S. 32-1158.02, Residential construction contracts (post-storm)
- A.R.S. 32-1124, 32-1154
- A.R.S. 33-1002, 44-1763, 44-5002, 44-5004
- ROC: Contract Requirements
- ROC sample general construction contract (Aug. 2026)
- ROC: Before You Hire a Contractor
Frequently Asked Questions
Does Arizona require a written contract with a contractor?
Yes, for a contract over $1,000 between a contractor and the owner of the property being improved. It must include the items listed in A.R.S. 32-1158(A). Failing to comply doesn't void the contract or create a defense in a lawsuit (32-1158(C)), but the ROC can discipline the contractor.
How much can an Arizona pool contractor take as a down payment?
No more than 15% of the original contract price at signing for a residential in-ground pool or spa sold to someone who lives or will live in the home. Later draws are capped at 25% each after excavation, after steel, plumbing and shotcrete, and after decking (A.R.S. 32-1158.01(A)(2)).
Can I cancel a storm-damage roofing contract in Arizona?
Yes. For repairs from a catastrophic storm in an insurer-designated area, you may cancel for any reason within four business days after signing, and within 72 hours after your insurer tells you the claim was denied. The contractor must refund payments within 10 days (A.R.S. 32-1158.02).
Can a contractor pay my insurance deductible in Arizona?
Not on a post-storm residential repair claim. Under A.R.S. 32-1158.02(J), the contractor may not advertise, promise or pay any part of your deductible or offer a rebate of it, and may not start work until the insurer approves or denies the claim, except to prevent further loss.