This page lists the Arizona laws enacted in the 2024, 2025 and 2026 legislative sessions that change how contractors work on homes, plus one notable veto. Each entry was checked against the chaptered session law on azleg.gov and the current statute text. Bills that were introduced but not enacted are left out, except where noted.

At a glance

Law Bill Signed What it changed
Laws 2024, ch. 89 HB 2110 April 8, 2024 Preliminary 20-day lien notice: formatting errors alone don't make a notice defective
Laws 2024, ch. 204 HB 2091 June 18, 2024 Continued the Registrar of Contractors to July 1, 2032
Laws 2025, ch. 181 SB 1182 May 13, 2025 Summer construction hours under a building permit
Laws 2026, ch. 175 SB 1419 June 19, 2026 Solar installers' roof duties and new contract disclosures

2024: Preliminary lien notice formatting (HB 2110)

Laws 2024, chapter 89 amended A.R.S. 33-992.01, the preliminary 20-day notice statute. The main change is a new subsection I: a notice that otherwise complies "is not defective based on the failure to use bold-faced type" or the failure to use type at least as large as the largest type on the document. The act also changed "within ten days of" to "within ten days after" in the notice's deadlines and relettered the later subsections.

What it means for you. A sub or supplier's lien rights won't be lost because its notice used the wrong font. Your duties are unchanged: within 10 days after you receive a notice, give the sender the correct project and payment-bond information, or lose inaccuracies as a defense (33-992.01(J)-(K)). See preliminary 20-day notice.

2024: The ROC is continued to 2032 (HB 2091)

Laws 2024, chapter 204 continued the Registrar of Contractors under the state's agency review law. It added A.R.S. 41-3032.04: the Registrar of Contractors terminates on July 1, 2032, and Title 32, Chapter 10, the contractor licensing law, is repealed on January 1, 2033, unless the Legislature acts again. The act states the agency is continued "to protect the public health, safety and welfare by licensing, bonding and regulating contractors engaged in construction and by administering the residential contractors' recovery fund."

The same law directed the ROC to study whether its oversight of commercial contractors could be removed by statute and to report to legislative leaders by December 31, 2024. The act made no change to residential licensing, the Recovery Fund or bond amounts.

What it means for you. Residential licensing, complaints and the Recovery Fund continue as described on this site.

2025: Summertime construction hours (SB 1182)

Laws 2025, chapter 181 added A.R.S. 9-500.52 (cities and towns) and 11-269.30 (counties). Between May 1 and October 15 each year, a city, town or county may not enact or enforce a noise ordinance that prohibits general construction:

  • from 5:00 a.m. to 7:00 p.m. on business days, and
  • from 7:00 a.m. to 7:00 p.m. on Saturdays,

if the work is done under a validly issued building permit from that jurisdiction. Local governments must also allow concrete to be poured at least one hour before general construction regularly starts. The act was an emergency measure, operative immediately when signed on May 13, 2025.

What it means for you. On permitted jobs in summer, expect crews before sunrise to beat the heat, and neighbors' permitted projects can start that early too. The law doesn't extend to Sundays and doesn't cover unpermitted work. See building permit requirements.

2026: Solar installations and your roof (SB 1419)

Laws 2026, chapter 175 amended A.R.S. 44-1761, 44-1762 and 44-1763. The current statute text on azleg.gov reflects the changes. Key points:

Roof duties for installers (44-1762(I)):

  • Before installing a solar energy device on a roof, the licensed contractor must evaluate the roof and roofing components to decide whether the roof can support the installation, and must recommend that you get an inspection by a licensed roofing contractor.
  • By installing, the contractor is deemed to have accepted the roof surface and is responsible for repairing roof damage caused by the installation.
  • Shade structures such as carports and livestock shade are excluded.
  • A contractor who doesn't comply is subject to ROC discipline.

Installation standards. Installations must meet fire, safety and building codes as prescribed by the local authority with jurisdiction, consumer protection requirements, and the manufacturer's installation requirements (44-1762(G)).

Contract disclosures (44-1763):

  • Before you sign a purchase or lease for a residential solar system, the licensed contractor must get your written acknowledgment that the roof or structure may need repair or replacement before the agreement ends. It must state that, unless the contractor's initial installation caused the damage, you may bear the cost of removing and reinstalling the system for roof work, and that removal and reinstallation may affect warranties and the installer's liability.
  • Warranty periods for a purchased system, its major components (panels, inverters, racking, batteries) and labor must be in bold type and separately initialed. For a lease, a component warranty shorter than the lease must be disclosed the same way.
  • The total price, fees and payment terms must be in bold and initialed. You must receive an estimated summary of maintenance and operating costs, and a disclosure of what maintenance and repairs are included.
  • Any savings estimate must come with a brief description of its basis: utility rates, assumed rate increases, estimated production and the status of utility compensation for exported energy.
  • Lease payments may not start until the system is granted permission to operate by the local utility and is energized and interconnected.

The definition of "solar energy device" now covers systems serving on-site demand at a residential dwelling or multifamily structure, and excludes utility-scale projects and commercial, industrial or institutional installations (44-1761).

What it means for you. Get the roof inspected by an R-42 or CR-42 roofer before a rooftop solar install, keep the acknowledgment and the installer's roof evaluation, and read the initialed warranty terms. An older tile or shingle roof may need work before panels go on. See license classes and roofers.

Vetoed: Recovery Fund assessments (SB 1087, 2025)

SB 1087, titled "residential contractor assessments; recovery fund," passed the Legislature in 2025 and was vetoed on April 18, 2025, according to the Legislature's bill status record (azleg.gov bill status API, SB 1087). The Recovery Fund assessment set out in A.R.S. 32-1126(G) is unchanged: not more than $600 per two-year license period. The ROC currently charges $370 with a new residential or dual license and $270 at renewal (ROC: Licensing Fees).

ROC actions in 2026

  • Updated sample contracts. The ROC's sample general construction, pool and spa, and emergency or catastrophic repair contracts are dated August 4, 2026 (ROC: Contract Requirements).
  • Executive Order 2026-01. The ROC's news page lists Executive Order 2026-01, "Protecting Paychecks for Hard-Working Arizonans" (October 13, 2026), which directs the Registrar of Contractors to convene an Industry Advisory Council on Paycheck Protection, and a joint report responding to it (October 30, 2026) (ROC: News). Neither changes residential licensing law.

What has not changed

The core homeowner rules on this site match the current statute text on azleg.gov as of November 2026:

  • the $1,000 handyman exemption (32-1121),
  • the $30,000 per-claimant and $200,000 per-license Recovery Fund caps (32-1132.01, 32-1139),
  • the two-year complaint deadlines (32-1162),
  • the three-business-day home solicitation cancellation right (44-5002), and
  • owner-occupant lien protection (33-1002).

Related pages

Sources

Frequently Asked Questions

What changed for solar installations in Arizona in 2026?

Laws 2026, chapter 175 (SB 1419), signed June 19, 2026, requires a licensed contractor installing solar on a roof to evaluate the roof first, recommend an inspection by a licensed roofing contractor, and repair roof damage caused by the installation. It also requires a written acknowledgment that the roof may need repair or replacement during the agreement term, and adds bold, initialed disclosures for warranties and costs (A.R.S. 44-1762, 44-1763).

How long will the Arizona Registrar of Contractors exist?

Laws 2024, chapter 204 (HB 2091) continued the agency. The Registrar of Contractors now terminates on July 1, 2032, and Title 32, Chapter 10 is repealed January 1, 2033, unless the Legislature continues it again (A.R.S. 41-3032.04).

What hours can contractors work in Arizona in the summer?

From May 1 to October 15, a city or county may not enforce a noise rule that bars general construction under a valid building permit between 5:00 a.m. and 7:00 p.m. on business days or 7:00 a.m. and 7:00 p.m. on Saturdays. Concrete may be poured at least an hour before the regular start (Laws 2025, ch. 181).

Did Arizona change the $1,000 handyman limit recently?

No. The current text of A.R.S. 32-1121(A)(14) still sets the handyman exemption at an aggregate price of less than $1,000, and none of the 2024 to 2026 session laws reviewed for this page changed it.