Quick answer
The City of Avondale Building Services Division, in Development Services (623-333-4000), takes all applications through the Accela Citizen Access Portal under the 2024 International Codes and 2023 National Electrical Code. Inspections run Monday through Thursday, 7 a.m. to 4 p.m., and a permit expires if no inspection is requested and approved within 180 days.
Avondale moved its permitting fully online and runs inspections on a four-day week. If you're scheduling a job around inspections, plan for no Friday visits.
Who issues building permits
The City of Avondale Building Services Division, part of the Development Services Department, reviews plans and checks that projects meet building, electrical, plumbing, mechanical, fuel gas, energy and accessibility requirements (Building Division). Avondale has adopted the 2024 International Codes and the 2023 National Electrical Code, along with city amendments that apply to all construction.
All development applications go through the Accela Citizen Access Portal (Submit an Application):
- Property owners, contractors and applicants each need an Accela account to submit.
- Fill in the online fields and the PDF application; some fields appear in both and must be completed in both.
- Upload each required document as a separate, clearly named PDF.
- Intake staff check completeness first, then route the application for plan review. More than one submittal may be needed.
- Questions about which record type to choose go to Development Services at (623) 333-4000.
Payments go through the Avondale Citizen Portal. Since June 1, 2026, card payments carry a convenience fee of 2.95% online or by phone (minimum $2.95) and 3.5% in person; cash, check, ACH e-check and PIN debit in person are free (Applications, Design Manuals, and Plans).
Inspections and permit expiration
From the city's Inspections page:
- Inspections are conducted Monday through Thursday, 7 a.m. to 4 p.m. The city is closed Fridays and city holidays.
- Schedule by text at (833) 324-1348, through the Selectron website with your permit number, or by phone at 623-333-4005. Requests before 4 p.m. are scheduled for the next business day.
- Work must be inspected at each stage before it's covered.
- Permits become valid only when all fees are paid, and they expire if an inspection isn't requested and approved within 180 days of issuance, or if work stops for 180 days.
- Pools have their own inspection sequence, including a pool safety inspection of barriers, gates, locks and alarms before the final.
Put inspection milestones in the contract so the permit doesn't expire mid-job. Arizona's pool enclosure law, A.R.S. 36-1681, requires a 5-foot barrier with outward-opening, self-closing, self-latching gates unless every resident is at least six.
Water conservation rebates
Avondale's rebates and programs for city water customers include:
- Residential Xeriscape Rebate: up to $800 for converting grass to water-efficient desert landscaping, for single-family customers. Pre-approval is required before starting, the project must meet minimum size and coverage rules with low-water-use plants, and it must be finished within one year of approval. You'll need a site plan, plant list and photos of the existing yard.
- Smart irrigation controller: $100 for a weather-based controller on a residential property.
- High-efficiency clothes washer: $100 when replacing an existing washer.
- Plumbing fixtures: $25 per low-flow showerhead and $75 per high-efficiency toilet.
- Rain barrels and cisterns: $50 to $150.
Some rebates require a W-9 before payment.
Summer work hours
A.R.S. 9-500.52 bars Arizona cities from enforcing a noise rule that stops permitted construction from May 1 to October 15 between 5 a.m. and 7 p.m. on business days, and between 7 a.m. and 7 p.m. on Saturdays.
Contractor licenses
Check every contractor on the Registrar of Contractors Contractor Search. Our Arizona licensing guide and ROC complaint process page explain what to do if work goes wrong.
Weather
NOAA's 1991-2020 normals for Litchfield Park, just northwest of Avondale, show 8.18 inches of precipitation a year, about 173 days at 90Β°F or hotter and 112 days at 100Β°F or hotter. July through September brings 2.61 inches in the monthly normals, and the average July high is 106.5Β°F. Book AC replacement in spring, and have roofs checked before monsoon storms.
Find contractors in Avondale
The directory lists Avondale plumbers, electricians, HVAC companies, roofers, remodelers, landscapers, painters, concrete contractors and window and door companies.
Compare bids with our Arizona HVAC costs and landscaping costs, use the hiring checklist, and get quotes.
Sources
- City of Avondale: Building Division
- City of Avondale: Submit an Application
- City of Avondale: Applications, Design Manuals, and Plans
- City of Avondale: Inspections
- City of Avondale: Water Conservation Rebates and Programs
- A.R.S. 36-1681: Pool enclosures
- A.R.S. 9-500.52: Construction; summertime hours
- Arizona ROC Contractor Search
- NOAA 1991-2020 annual/seasonal normals: Litchfield Park (USC00024977)
- NOAA 1991-2020 monthly normals: Litchfield Park (USC00024977)
Frequently asked questions
How do I schedule a building inspection in Avondale?
Text your request to (833) 324-1348, use the city's Selectron website with your permit number, or call 623-333-4005. Requests made before 4 p.m. are scheduled for the next business day. Inspections run Monday through Thursday, 7 a.m. to 4 p.m.; the city is closed Fridays and city holidays.
When does an Avondale building permit expire?
A permit expires if an inspection hasn't been requested and approved within 180 days of issuance, or if work goes inactive for 180 days. Permits become valid only after all fees are paid.
Does Avondale offer a grass removal rebate?
Yes. Avondale's Residential Xeriscape Rebate pays up to $800 to single-family customers who convert grass to water-efficient desert landscaping. Pre-approval is required before you start, and the project must be finished within one year of approval.
Are there fees for paying Avondale permit fees by card?
Since June 1, 2026, Avondale charges a 2.95% convenience fee (minimum $2.95) on online and phone card payments and 3.5% on in-person credit card payments. Cash, check, ACH e-check and in-person PIN debit carry no fee.